Enter all data in I-P units. Units converter
If your location is not included here, choose a nearby location with similar weather conditions.
Energy credits can be specified in the Credits tab.
This information will appear on the compliance report.
Only add Areas with lighting alterations.
Use the Component Buttons above to add/specify those assemblies that will be altered by this project. Use the Component Buttons above to create a description of your building.
Only include those assemblies that will remain after the alteration is completed.
Fixtures cannot be added until building use categories have been specified on the Project screen.
Specify 'Alteration Details' for each listed area category to determine if compliance is required. Add fixtures to each 'Compliance required' area category by first selecting the relevant row, then clicking the appropriate lighting fixture buttons. Use the Component Buttons above to create a description of the lighting in your building.
Fixtures cannot be created until area categories have been specified.
Only add fixtures that will remain after the alteration project is complete.
Lighting is currently not included in the compliance calculations. If you wish to enable lighting compliance for this building, switch to the Project folder and check the box labeled "Include Lighting Compliance Calculations".
Fixtures cannot be added until exterior areas have been specified on the Project screen.
Use the Component Buttons above to create a description of the exterior lighting for your building.
Note that fixtures cannot be created until area categories have been specified.
Use the mechanical equipment buttons above to add/specify those mechanical systems that will be altered by this project. Use the mechanical equipment buttons above to list the mechanical systems in your building.
Only include those systems that will remain after the alteration is completed.
Prohibited: Electric resistance space heating, including baseboard radiation, heat pump reheat coils, duct coils, boilers, domestic hot water heaters and coils in terminal units and air systems.Exceptions may apply. See Section 503.1.2 for details.
Credits cannot be added until building use categories have been specified on the Project screen.
Select the category of interest then select a requirement from the list to view and modify in the details section below.
Starting COMcheck-Web…