Reports
Code/Location

Enter all data in I-P units. Units converter

If your location is not included here, choose a nearby location with similar weather conditions.

Project Type
Heating Fuel/Energy Type
Compliance Method
Compliance Options
Credits:    Required    Proposed


Additional Efficiency Package(s) (C406)
None selected

Energy credits can be specified in the Credits tab.

Project Details (optional)
Edit Project Details…

This information will appear on the compliance report.


  • Building Area
    Area Description
    Space Conditioning
    Area

Only add Areas with lighting alterations.

  • Building Area Area Category
    Area Description
    Area
  • Exterior Lighting Area
    Area Description
    Quantity
    W/Unit
    Tradable
Note: ATM/Night depository sites have a base allowance of 180W per site. See Help for details.
Options

Daylighting Allowances

  • Component
    Assembly
    Building Area Type
    Fenestration Details
    Construction Details
    Gross Area or Slab Perimeter
    Cavity Insulation R-Value
    Continuous Insulation R-Value
    U-Factor
    UA
    SHGC
    Projection Factor

Use the Component Buttons above to add/specify those assemblies that will be altered by this project. Use the Component Buttons above to create a description of your building. Help

Only include those assemblies that will remain after the alteration is completed.

  • Component
    Fixture ID
    Fixture Description
    Lamp Description / Wattage Per Lamp
    Ballast
    Lamps Per Fixture
    Number of Fixtures
    Fixture Wattage
Interior Lighting Totals:
No interior fixtures are defined. Allowed wattage = 0 Proposed wattage = 0

Fixtures cannot be added until building use categories have been specified on the Project screen.

Specify 'Alteration Details' for each listed area category to determine if compliance is required. Add fixtures to each 'Compliance required' area category by first selecting the relevant row, then clicking the appropriate lighting fixture buttons. Use the Component Buttons above to create a description of the lighting in your building. Help

Fixtures cannot be created until area categories have been specified.

Only add fixtures that will remain after the alteration project is complete.

Lighting is currently not included in the compliance calculations. If you wish to enable lighting compliance for this building, switch to the Project folder and check the box labeled "Include Lighting Compliance Calculations".

  • Component
    Fixture ID
    Fixture Description
    Lamp Description / Wattage Per Lamp
    Ballast
    Lamps Per Fixture
    Number of Fixtures
    Fixture Wattage
Tradable Wattage Totals:
No exterior fixtures are defined. Allowed wattage = 0 Proposed wattage = 0 Supplemental Wattage: 0 Help

Fixtures cannot be added until exterior areas have been specified on the Project screen.

Use the Component Buttons above to create a description of the exterior lighting for your building. Help

Note that fixtures cannot be created until area categories have been specified.

Proposed part load efficiency data may be required for HVAC or Plant cooling systems.
  • Component
    Equipment Type
    Quantity
    Equipment Capacity
    Fuel Type/Heat Source
    Condenser Type
    Fan System
    System Details
    Proposed Part Load Eff.
    Required Part Load Eff.
    Proposed Full Load Eff.
    Required Full Load Eff.

Use the mechanical equipment buttons above to add/specify those mechanical systems that will be altered by this project. Use the mechanical equipment buttons above to list the mechanical systems in your building. Help

Only include those systems that will remain after the alteration is completed.

Prohibited: Electric resistance space heating, including baseboard radiation, heat pump reheat coils, duct coils, boilers, domestic hot water heaters and coils in terminal units and air systems.
Exceptions may apply. See Section 503.1.2 for details.

fails
Credits:    Required    Proposed
  • Component
    Credits

Credits cannot be added until building use categories have been specified on the Project screen.

Select the category of interest then select a requirement from the list to view and modify in the details section below. Help

Requirements

Details

« To display compliance results, click the Check Compliance button.
--
Envelope TBD
--
Int. Lighting TBD
--
Ext. Lighting TBD

Help

Starting COMcheck-Web